Monadnock Valley Railroad

Home

2018- Peterborough NH

P'boro Home Page

P'boro Track Plan

P'boro Track Construction

P'boro Trestle Constr

Peterborough Enginehouse

Caboose Construction

P'boro Gallery

2003-2017 Greenfield NH

Track Plan

Track Construction

Trestle Constr

Enginehouse

Signal System

Gallery - Stills

Gallery - Videos

1989-2001 Goldens Brdg NY

Contact Us

Some Winter Scenes - February 2022

Looking east, this photo highlights the south loop grade crossing, one of the passing track switches and the north end of the trestle.

The two plywood boxes in the foreground cover the motorized, remote control switches.  The small aluminum box on the post to the right of the track houses one of the sets of push buttons that allow the engineer to control the motorized switches directly from the train.  Another set is located at the south end of the trestle.

The three-track stub switch at the entrance of the rail yard leading to the enginehouse.

The stub switch throw mechanism.

 

Copyright © 1989 - 2022, Monadnock Valley Railroad, All rights reserved.